RIG Inspection in Nigeria
🇳🇬 Nigeria · West Africa

RIG Inspection in Nigeria.

24–48 Hours Mobilization Regional Project Taskforce

KAMIT coordinates with leading EPC contractors and multinational energy operators in Nigeria to deliver independent QA/QC, non-destructive testing, and statutory compliance audits.

(01)Field Operations · Nigeria
Certified inspector verifying rotary table slips and wellhead handling gear
Blowout preventer (BOP) stack and choke manifold pressure test verification
Heavy mobile crane hoisting drilling rig substructure during rig move
Hydraulic catwalk, pipe handler and mast hinge pin structural inspection

KAMIT’s drilling specialists perform comprehensive condition and compliance inspections of onshore and offshore drilling rigs and workover units.

We verify masts, substructures, drawworks, crown blocks, top drives, and pressure control systems in compliance with API specifications and statutory licensing.

(02)Regulatory Alignment

Statutory Compliance & Regulatory Alignment in Nigeria

All inspection protocols and third-party verification deliverables issued by KAMIT in Nigeria are structured to satisfy national statutory bodies as well as strict international engineering standards:

  1. 01 NUPRC (Nigerian Upstream Petroleum Regulatory Commission)
  2. 02 SON (Standards Organisation of Nigeria)
  3. 03 NMDPRA
(03)Key Industry Sectors Served in Nigeria
Upstream Deepwater Oil & GasDangote Refinery & PetrochemicalsPipeline NetworksOffshore Terminals
(04)Verified Technical Information

Frequently Asked Questions: RIG Inspection (Nigeria)

Who provides certified RIG Inspection in Nigeria?

KAMIT Energies provides ISO 9001:2015 accredited RIG Inspection across Nigeria, supported by certified Level III NDT engineers and statutory inspectors with mobilization from regional technical bases (24–48 Hours Mobilization).

What regulatory codes and standards apply to RIG Inspection in Nigeria?

Our inspection and verification protocols in Nigeria align with NUPRC (Nigerian Upstream Petroleum Regulatory Commission), SON (Standards Organisation of Nigeria), NMDPRA statutory requirements, alongside international codes including ASME, API, ASNT/ISO 9712, and BS EN standards.

How quickly can KAMIT mobilize technical testing teams to project sites in Nigeria?

Mobilization to project sites in Nigeria takes 24–48 Hours Mobilization. Teams are dispatched with calibrated testing equipment, valid offshore/onshore medicals, and statutory safety credentials.

What industries in Nigeria require RIG Inspection?

Key sectors requiring this service across Nigeria include Upstream Deepwater Oil & Gas, Dangote Refinery & Petrochemicals, Pipeline Networks, Offshore Terminals.

(→)Next step

Mobilize Certified RIG Inspection in Nigeria

Connect with our technical engineering desk to coordinate statutory audits, Level III NDT testing, or lifting certification across Nigeria.